CSDB Campus
Facilities Master Plan
Controlled Maintenance 5-Year Plan
Historic Designations
The Colorado School for the Deaf and the Blind (CSDB) occupies six city blocks of a residential area adjacent to downtown Colorado Springs. Upon its establishment at this site in 1876, the school was beyond the eastern edge of the city. Today it is an integral part of the downtown area and predates the growth of the neighborhood around it. Situated on a park-like campus of undulating grassy hills and many fine old trees, the school consists of historic buildings and recent constructions. Occupying most of the campus are substantial stone buildings, reflecting the English-inspired architecture that proliferates through much of the city. All the historic buildings retain their integrity of locations, design, materials and workmanship. The newer buildings are modern, low-profile, brick construction that appear to defer to the surrounding historic structures
News and Updates
Active Funded Projects
Contract Awards
- ADA Playground
- Administration Building Exterior Rehabilitation
- Argo Hall Roof Replacement
- Hubert Work Gymnasium Renovation
- Industrial Roof Repair
- West Hall Roof Replacement
- Campus Security Upgrades
- Elevator Upgrades & Modernization
ADA Playground
Administration Building Exterior Rehabilitation
Argo Hall Roof Replacement
Hubert Work Gymnasium Renovation
Industrial Roof Repair
West Hall Roof Replacement
Campus Security Upgrades
Elevator Upgrades & Modernization
Solicitations
Domestic Water Line Replacement
Reporting Requirements for Public Projects as per HB13-1292
- Contracting Method – Design/Build Guaranteed Maximum Price (GMP)
-
Rationale: gain cost certainty and control while benefiting from the efficiency and reduced timelines of the Design-Build approach. The GMP shifts the risk of cost overruns to the contractor. Contractor, design team, and owner collaborate from the start to define the scope, budget, and schedule which leads to better cost management, constructability analysis, and a realistic GMP.

Elevator Upgrade & Modernization
Reporting Requirements for Public Projects as per HB13-1292
- Contracting Method – Design/Bid/Build
-
Rationale: to achieve lower construction costs through competitive bidding, maintain greater owner control over the design, and leverage a familiar, transparent process that is well-suited for projects with a clearly defined scope.

Completed Projects
- Administration Building Exterior Rehabilitation
- Industrial
- West Hall Roof Replacement Design/Build
- Hubert Work Gym
- Argo Hall Roof Replacement
- ADA Playground
- Security Upgrades
- Notice of Final Settlement
Administration Building Exterior Rehabilitation
Industrial
West Hall Roof Replacement Design/Build
Hubert Work Gym
Argo Hall Roof Replacement
ADA Playground
Security Upgrades
Notice of Final Settlement
Hubert Work Gym Phase 3
Notice is hereby given that on 2/20/2026 at 33 N. Institute, Colorado Springs, CO 80921, final settlement will be made by the STATE OF COLORADO with MW Golden Constructors for Project 2022-022M21 / Hubert Work Gym Phase 3. Anyone who has an unpaid claim with MW Golden Constructors against said project, for or on account of the furnishing of labor, materials, team hire, sustenance, provisions, provender, rental machinery, tools, or equipment and other supplies used or consumed by such Contractor or any of his subcontractors in or about the performance of said work, may at any time up to and including said time of such final settlement, file a verified statement of the amount due and unpaid on account of such claim. Retainage shall be excluded from such claims, except where a dispute or legal action exists between MW Golden Constructors and any subcontractor on the project concerning the limitation or release of retainage, and you contest such limitation. All such claims shall be filed with Mike Nero mnero@csdb.org , the Facilities Director for CSDB. Failure to file such statement claim prior to final settlement on 2/20/2026 will relieve the State of Colorado from any and all liability for such claims.
State Solicitations Notifications
The Colorado School for the Deaf and the Blind (CSDB) uses the following solicitation services for our projects.
BidNet Direct (opens in new tab)
Contact
Mike Nero, Facilities Director
Office: (719)578-2128
Email